To prepare for installation, the steel beam guardrail segments must first be bolted together and positioned on the ground. Once assembled, the Blade Raiser, mounted on a crawler pile driver, lifts the segments, streamlining the mounting process. This setup ensures precise positioning of the blade at the designated point, allowing the pile to be driven securely into the ground and bolted to the rail with accuracy and ease.